Temperature-controlled concrete for mass pours that demand discipline.
Engineered for raft foundations, transfer slabs, and continuous mass pours. Concrete temperature ≤25°C. Heat of hydration controlled. Continuous discharge for 4-8 hours.
Inside Alpha Mass
Alpha Mass solves the hardest problem in concrete: pouring 200, 500, or 1000 cubic meters in a single continuous session without thermal cracking or strength loss. Mass concrete generates heat as cement hydrates; uncontrolled, this heat creates thermal gradients that crack the structure. Alpha Mass eliminates this risk through engineered cooling, calibrated retarders, and SCM blends.
We pre-cool the concrete in three ways: chilled mixing water (10-15°C), partial replacement of mixing water with ice (up to 30%), and shaded aggregate stockpiles. The concrete leaves our plant at 22-24°C even on Bangalore's hottest summer days. Combined with high GGBS or fly ash replacement (40-60%), the heat of hydration is reduced by 30-40% compared to OPC concrete.
For pours exceeding 100 m³, we add a structural engineer-approved retarder dosage, extending workability to 120+ minutes. For pours exceeding 500 m³, we coordinate with multiple plants and provide dedicated dispatch teams. Alpha Mass brings world-class mass-pour capability to Bangalore.

Built for mass concrete pours
Chilled water (10-15°C), ice integration (up to 30% of mix water), and shaded aggregates ensure target temperature even at 38°C ambient.
40-60% SCM replacement (GGBS or fly ash). Lower cement clinker content. Engineered to reduce peak temperature in mass element by 30-40%.
Ice plant integration at our Ramohalli plant. Chilled water tanks at 10-15°C. Aggregate pre-cooling for critical pours.
Calibrated retarder dosage extends initial setting time to 6-8 hours. Single mass pour can extend to 8 hours without cold joints.
40-60% mineral admixture replacement. Lower heat, higher long-term strength, better durability. Approved SCM sources with MTCs.
Dedicated dispatch coordination. Multiple TMs scheduled at 8-12 minute intervals. Real-time tracking via BuildX Live (Q1 2027).
Built for these projects
Single continuous pour 100-2000 m³. Hospital basements, commercial high-rise foundations, infrastructure piers.
Mid-rise structural transfer slabs 1-3m thick. Mass pours requiring controlled temperature.
Industrial machinery foundations, generator platforms, heavy equipment bases. Where thermal cracking would compromise structural integrity.
Retaining walls 1m+ thick. Mass concrete dams. Bridge piers and abutments.
Documented pours with Alpha Mass
The fine print, in full
| Compressive Strength (28-day) | 30 – 50 N/mm² (per grade) |
| Cement Type | OPC 53 + GGBS (40-60%) or PPC + Fly Ash |
| Cement Content (clinker only) | 200 – 280 kg/m³ |
| Total Cementitious Content | 320 – 420 kg/m³ |
| Mineral Admixture | GGBS 40-60% or Fly Ash 30-50% |
| W/C Ratio | 0.38 – 0.45 |
| Concrete Temperature at Delivery | 22 – 25°C |
| Peak Hydration Temperature (in-mass) | 55 – 65°C controlled |
| Slump | 100 – 150 mm |
| Slump Retention | 120 minutes minimum |
| Setting Time (initial) | 6 – 8 hours |
| Heat of Hydration | 30-40% lower than OPC concrete |
| Ice Replacement Capability | Up to 30% of mix water |
| Code Reference | IS 456:2000, IS 7861, IS 12089, IS 12330 |
Alpha Mass mix designs
Resources by role
- Use Alpha Mass when pour size exceeds 50 m³ continuously, ambient >35°C, or mass element thickness >1m.
- Single-day pours possible up to 1000 m³.
- Lead time: 7+ days pre-booking essential. Site visit by our team before pour.
- Pricing: Premium over standard concrete. Contact for project-specific quote.
- BOQ: "M[X] grade RMC, temperature-controlled, IS 456:2000 + IS 7861. Concrete temperature at placement ≤25°C. SCM replacement min [X]%. Heat of hydration controlled per IS 12089. Retarder for ≥120 min workability."
- Mix design code: AC-MS-[Grade]
- Documentation: Mix design with thermocouple monitoring plan, pour planning document, dispatch schedule, SCM MTCs, ice plant capacity certificate.
- Pre-pour: Site visit by Alpha QC team 48 hours before. Temperature monitoring setup.
- Slump on receipt: 100-150mm ±25mm. Temperature on receipt: 22-25°C — verify with thermometer.
- Construction joint planning: Critical for >50 m³ pours. Alpha team co-plans.
- Curing: Minimum 14 days, wet hessian + polythene preferred for mass elements.
About Alpha Mass
Ready to specify Alpha Mass?
Talk to an Alpha engineer about your project. We'll match the right grade and dispatch plan.
You may also need
The specifications shown represent typical ranges for Alpha Concrete's product family. Actual mix designs are project-specific and subject to verification by our QC team. Quoted specifications must be confirmed against actual lab results before commercial commitment. Contact our QC team for project-specific mix design certification.