Temperature-controlled concrete delivered below 25°C at the chute.
Chilled ready-mix for hot-weather pours, long hauls and heat-sensitive elements. Placement temperature controlled with ice, chilled water and cooled aggregate.
Inside Alpha Cool
Alpha Cool is ready-mix concrete supplied with a controlled placement temperature. In Bangalore's summer, uncontrolled concrete can reach the chute at 34-38°C, which accelerates slump loss, shortens the finishing window and raises the risk of plastic shrinkage and thermal cracking. Alpha Cool holds the delivered temperature at or below the project-specified limit — typically 25°C.
Temperature is brought down with a combination of flake ice replacing part of the mix water, chilled batching water, shaded and sprinkler-cooled aggregate stockpiles, and dispatch scheduling that moves heat-sensitive loads to the cooler part of the day.
The delivered temperature is measured and recorded at the plant and again at the point of discharge. For mass elements, thermocouple monitoring of core and surface temperature is available so the differential stays inside the specified limit during the critical first 72 hours.

Built for hot weather and heat-sensitive pours
Part of the mix water replaced with flake ice and the balance chilled, dropping placement temperature by 8-12°C.
Measured at dispatch and at the chute. Recorded on the batch ticket so the site QA file shows the delivered temperature.
Retarder system tuned to the delivered temperature, so slump survives traffic and the finishing window stays open.
For mass elements, core-to-surface differential targeted below 20°C with thermocouple monitoring and an insulation plan.
Heat-sensitive pours scheduled into the cool window and sequenced so trucks do not idle in the sun.
M25 to M60, and combinable with pumpable high-rise or self-compacting mix logic where the project needs both.
Built for these projects
Thick rafts, pile caps, transfer slabs where hydration heat must be controlled.
Column and slab pours during March-June when ambient exceeds 34°C.
Sites at the edge of the service radius where transit time compounds temperature gain.
Podium decks and industrial floors where a long finishing window is critical.
The fine print, in full
| Compressive Strength (28-day) | 25 – 60 N/mm² (per grade) |
| Placement Temperature | ≤ 25°C target (project-specific limit) |
| Cooling Method | Flake ice + chilled batching water + cooled aggregate |
| Ice Replacement | Up to 60% of mix water by weight |
| Cement Type | OPC 53 with GGBS 30-50% (lower heat of hydration) |
| W/C Ratio | 0.34 – 0.45 (ice counted as mix water) |
| Chemical Admixture | PCE superplasticizer + retarder, dosed to delivered temperature |
| Core-Surface Differential | < 20°C target with monitoring |
| Peak Core Temperature | < 70°C target for mass elements |
| Monitoring | Chute temperature per load; thermocouples for mass pours |
| Code Reference | IS 456:2000, IS 7861 Part 1 (hot weather concreting) |
Alpha Cool mix designs
Resources by role
- Use this product for: summer pours, mass rafts, long-haul deliveries and any element with a specified placement-temperature limit
- Pricing: Contact for project quote
- Lead time: Standard (24-hour notice)
- BOQ specification: "Supply & deliver Alpha COOL ready-mix concrete as per IS 456:2000"
- Mix design code: AC-COOL
- Documentation provided: Mix design, MTC, batch tickets, cube test reports
- Slump on receipt: 100 – 160 mm; check and record concrete temperature at the chute for every load
- Cube samples: 1 set per 30 m³ (3 cubes per set)
- Curing: Minimum 14 days, wet cure or curing compound; keep surfaces protected from wind and direct sun
About Alpha Cool
Ready to specify Alpha Cool?
Talk to an Alpha engineer about your project. We'll match the right grade and dispatch plan.
You may also need
The specifications shown represent typical ranges for Alpha Concrete's product family. Actual mix designs are project-specific and subject to verification by our QC team. Quoted specifications must be confirmed against actual lab results before commercial commitment. Contact our QC team for project-specific mix design certification.